BUILD WorkshopClickHouse Workshops

09 Wrap-up

Instructor notes for module 09 — timing, talk track, common failures, and reset steps.

Your computer
macOS terminal: Run workshop commands in Terminal using zsh or bash.

Facilitator companion to the learner lesson 09 Wrap-up.

Timing

About 10 minutes. Reserve time for two or three volunteer demos on the projector.

Talk track

  • Recap the arc: from a local app to a real-time, observable, AI-assisted platform on ClickHouse Cloud in one session.
  • Reinforce the take-home: managed ClickHouse, Postgres, ClickPipes, Agents, and ClickStack artifacts persist for the trial. The local app and telemetry forwarder restart with Docker.
  • TODO: expand, and prepare the closing pointers (ClickHouse docs, Agents, ClickStack).

Common failures

  • Volunteers' apps not in a demo-ready state; pre-select who will present.
  • TODO: add anything seen in the dry run.

Reset steps

  • Reset any shared state used for demos (managed Postgres fallback pool and projector channel).
  • TODO: confirm the shared-state teardown checklist.

On this page